M0 motorway East (M30-31 Pécel) monitoring study of traffic and noise analysis

M0 motorway East (M30-31 Pécel) monitoring study of traffic and noise analysis

2010

Job description

Job description

Based on preprocessed data from ÁAK Zrt traffic counter measuring sites, creating a traffic analysis. Creating a noise analysis of the current and future state of the completed pavement acoustic properties and the preparation. Implementation of noise reduction for long-term state.

The finished section's noise measurements, traffic counts and the analysis of changes in traffic this year. Based on the results and the design plan, the constructed noise intervention system's review of the effects of noise interference calculations by the environmental inspectorate needs of the resource type. The time frame of the current testing year 2009 and year 2024 projected state.